5590C38 CONNETTORE GIUNZIONE ANTERIORE/BRIGLIA PREDISPOSIZIONE ALLESTITORI - S.R.
APPLICABLE TO VERSIONS WITH: Additional heater (Webasto)
|
Removing
(
Refitting
)
- Turn the ignition key to the STOP position and extract it. Op. 5530B54 BATTERY COVER - R+R - Disconnect the negative battery terminal. |
|
- |
BATTERY |
See A001 BATTERY |
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Remove the switch unit on the dashboard, operating as shown in the procedure: Op. 7040A82 SWITCH UNIT ON LEFT SIDE OF DASHBOARD - R.R. 2. Find the electrical coupling, disconnect it and extract the wiring. |
|
2 |
FRONT COUPLING/AMBULANCE PREPARATION |
See D296 FRONT COUPLING/AMBULANCE PREPARATION |
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Remove the safety slit (1a) using a screwdriver (1b).
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Extract the cables (1a) from connector (1b) using the tool (1c).
|
2.000.018.609 |
Extractor |
Terminal extractor |
|
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation
|
- To replace the terminals proceed as follows.
|
These illustrations only refer to replacing an individual terminal for the connector block illustrated, but are valid for all families of connectors. If several terminals are being replaced, make offset junctions between them in order to restrict the size of the cable loom and thereby facilitate the subsequent refitting in the sheath.
|
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Measure the cable that has just been cut (1a), then cut the replacement cable (1b) 15 mm longer than the cable to be replaced.
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Strip the new replacement cable (1a) and the corresponding wiring cable (1b) for a maximum length of 10 mm.
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation
|
|
To avoid cutting the strands and losing part of the cable conduction powers, it is advisable to expose the cables carefully.
|
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Fit the thermal restricting coupling tube (1a) on the wiring cable. Starting as illustrated in the figure (1b) twist the strands (1c), then move the coupling tube (1a) until the coupling is covered with the tin ring (1d) by the twisted strands (1c).
A. Thermal shrinking coupling tube
B. Adhesive ring
C. Tin ring
D. Twisted strands
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation

|
1. Using the drier (1a) fitted with the heat shield (1b) heat the thermal shrinking tube (1c) until the tin ring (1d) melts as illustrated in figure (1e).
Wait for the tin to cool down, then refit the wiring.
|
2.000.029.200 |
Sheet |
Heat shield sheet |
|
|
Take great care not to get the cables to be joined dirty as this will adversely affect the continuity of the electrical conduction. While heating the thermal shrinking tube, as a result of the high temperatures reached, the drier and the heat shield must not, under any circumstances, come into contact with clothes or other compartments.
|
|
The drier used in this procedure is commercially available.
|
|
|
APPLICABLE TO VERSIONS WITH: Ambulance preparation
|
Refitting
(
Removing
)
- Fit the terminals in the connector block checking that the retaining tabs are secured. - Slightly pull every single cable checking that the terminals are secured correctly. - Reposition the safety slit. - Connect the electrical coupling and place the wiring in its housing. |
|
- |
FRONT COUPLING/AMBULANCE PREPARATION |
See D296 | - Fit the switch unit on the dashboard, operating as shown in the procedure:Op. 7040A82 - Connect the negative battery terminal. - Check the operation of the electrical system. Op. 5530B54 |
|