![]() |
- Follow the safety instructions. |
![]() |
- Use the special draining and repressurizing equipment. - Let the engine run with the air conditioning on for 10 - 15 minutes.
1. Unscrew the plug protecting the needle valve on the high pressure pipe (HIGH). 2. Connect the fast-on valve, identified by its red colour, to the connector. 3. Unscrew the plug protecting the needle valve on the high pressure pipe (LOW). 4. Connect the fast-on valve, identified by its blue colour, to the connector.
|
